Noise Study Documents

To ensure your jurisdiction, agency or organization is as informed as possible, documents developed during the course of the Part 150 Study will be posted here. The documents are listed here by topic.


OSU Airport Part 150 Noise and Land Use Compatibility Study Draft Report

(Submitted to FAA, June 2010)

 

Report Cover

Table of Contents

Chapter 1: Introduction

Chapter 2: Aviation Activity Forecast

Chapter 3: Noise Fundamentals

Chapter 4: Noise Modeling

Chapter 5: Airport Operational Data

Chapter 6: Noise Exposure

Chapter 7: Coordination

Chapter 8: Noise Certification

Chapter 9: Aircraft and Airport Operations Noise Abatement and Mitigation Alternatives

Chapter 10: Off Airport Land Use Compatibility Planning

Chapter 11: Noise Program Management

Chapter 12: Implementation of Noise Compatibility Program

Chapter 13: Program Benefits Costs Reviews and Updates

Appendix A: Review of OSUA's Noise Complaint Study

Appendix B: Noise Measurement Observations

Appendix C: Aircraft Modeling Substitution Approval

Appendix D: Existing Flight Tracks

Appendix E: Future Flight Tracks

Appendix F: Evaluation of Jet Altitude Profiles

Appendix G: Operations Verification

Appendix H: Part 150 Advisory Committee and Technical Subcommittee Rosters

Appendix I: Newsletters

Appendix J: Media Outreach and news Coverage

Appendix K: Meeting Announcements

Appendix L: Open House Sign-In Sheets

Appendix M: Meeting Summaries

Appendix N: Part 150 Study Website

Appendix O: Aviation Acronyms

Appendix P: Aviation Glossary

Appendix Q: 2008 NEM (11" x 17")

Appendix R: 2013 NEM (11" x 17")

Appendix S: Public Comments

Appendix T: Technical Subcommittee Materials

Appendix U: Sound Exposure Level Contours

Appendix V: Flight Track Use Percentages

Appendix W: Noise Abatement Guidelines

Appendix X: NEM Checklist

Appendix Y: FAA Correspondence

Appendix Z: Public Hearing Transcript

 


OSU Airport Part 150 Noise and Land Use Compatibility Study Draft Report

(October 2009)

 

The document below includes chapter summarizing Phase 1 of the study  - the Noise Exposure Map development phase - and Phase 2 of the study - the Noise Compatibility Program development phase. Chapters one through eight have already been submitted and accepted by the Federal Aviation Administration. Chapters nine through 13 are new, and summarize the Noise Compatibility process, review, analysis, findings and recommendations. We will continue to accept comments on these draft chapters through Friday, December 11, 2009.

 

For your convenience, the entire draft report is provided below, followed by the sections that were produced for each study phase..

 

Printed copies of the draft report are available at OSU Airport and the Dublin, Old Worthington and Hard Road libraries.

 

Cover

Table of Contents

Chapter 1: Introduction

Chapter 2: Forecast

Chapter 3: Noise Fundamentals

Chapter 4: Noise Modeling

Chapter 5: Operational Data

Chapter 6: Noise Exposure

Chapter 7: Coordination

Chapter 8: Noise Certification

Chapter 9: Aircraft and Airport Operational Alternatives

Chapter 10: Off Airport Land Use Compatibility Planning

Chapter 11: Noise Program Management

Chapter 12: Implementing Noise Compatibility Program

Chapter 13: Program Benefits Costs Reviews and Updates

Appendix A: Review of OSUA's Noise Complaint Study

Appendix B: Noise Measurement Observations

Appendix C: Aircraft Modeling Substitution Approval

Appendix D: Existing Flight Tracks

Appendix E: Future Flight Tracks

Appendix F: Evaluation of Jet Altitude Profiles

Appendix G: Operations Verification

Appendix H: Part 150 Advisory Committee and Technical Subcommittee Rosters

Appendix I: Newsletters

Appendix J: Media Outreach and News Coverage

Appendix K: Meeting Announcements

Appendix L: Open House Sign-In Sheets

Appendix M: Meeting Summaries

Appendix N: Part 150 Study Website

Appendix O: Aviation Acronyms

Appendix P: Aviation Glossary

Appendix Q: 2008 NEM (11" x 17")

Appendix R: 2013 NEM (11" x 17")

Appendix S: Public Comments Through August 2009

Appendix T: Technical Subcommittee Materials

Appendix U: Sound Exposure Level Contours

Appendix V: Flight Track Use Percentages

Appendix W: Noise Abatement Guidelines

Appendix X: NEM Checklist

Appendix Y: FAA Correspondence

Letter to FAA With Omitted Phase 1 Stakeholder Comments


 

Part 150 Phase 2:

Noise Compatibility Program Development Phase Documents (March 2010)


Chapter 9: Aircraft and Airport Operations Noise Abatement and Mitigation Alternatives

Chapter 10: Off Airport Land Use Compatibility Planning

Chapter 11: Noise Program Management

Chapter 12: Implementation of Noise Compatibility Program

Chapter 13: Program Benefits Costs Reviews and Updates

Appendix S: Public Comments

Appendix W: Noise Abatement Guidelines

Appendix X: NEM Checklist

Appendix Y: FAA Correspondence

 

Noise Abatement Technical Analysis Memo - April 2009

Noise Compatibility Memo - January 2009


 

Part 150 Phase 1:

Noise Exposure Map Report (FAA Acceptance, July 2009)


OSU Airport Final Noise Exposure Map Report

Table of Contents

Chapter 1: Introduction

Chapter 2: Forecast

Chapter 3: Noise Fundamentals

Chapter 4: Noise Modeling

Chapter 5: Operational Data

Chapter 6: Noise Exposure

Chapter 7: Coordination

Chapter 8: Noise Certification

Appendix A: Review of OSUA's Noise Complaint Study

Appendix B: Noise Measurement Observations

Appendix C: Aircraft Modeling Substitution Approval

Appendix D: Existing Flight Tracks

Appendix E: Future Flight Tracks

Appendix F: Evaluation of Jet Altitude Profiles

Appendix G: Operations Verification

Appendix H: Part 150 Advisory Committee and Technical Subcommittee Rosters

Appendix I: Newsletters

Appendix J: Media Outreach and News Coverage

Appendix K: Meeting Announcements

Appendix L: Open House Sign-In Sheets

Appendix M: Meeting Summaries

Appendix N: Part 150 Study Website

Appendix O: Aviation Acronyms

Appendix P: Aviation Glossary

Appendix Q: 2008 NEM (11" x 17")

Appendix R: 2013 NEM (11" x 17")

Appendix S: Public Comments

Appendix T: Technical Subcommittee Materials

Appendix U: Sound Exposure Level Contours

Appendix V: Flight Track Use Percentages

Letter to FAA With Omitted Phase 1 Stakeholder Comments

FAA NEM Acceptance Letter

Map A: 2008 Noise Exposure Map

Map B: 2013 Noise Exposure Map

ESA Memo on OSU Airport Noise Complaint System Review


Phase I Reference Guide

Study Background and Process

Decision-Making Framework

Noise Model Inputs Part 1

Technical Memo on Noise Modeling

Noise Model Inputs Part 2

Noise Modeling Overview and Draft Noise Exposure Maps

Part 150 Overview and Draft Exposure Maps

Noise Monitoring Locations

Measurement Results - East

Measurement Results - West


 

Part 150 Committee


Roster

Operating Agreement

Goals


 

Part 150 Study Team


Core Working Team

RS&H Consultant Team Resumes


 

Part 150 Newsletters


Newsletter #1

Newsletter #2

Newsletter #3